Project Description
The rooftop solar power system at this plant was implemented on September 22, 2020, with VAS as the project developer and contractor. This system has a capacity of 1162kWp.
Home Page / Projects / CNP
The rooftop solar power system at this plant was implemented on September 22, 2020, with VAS as the project developer and contractor. This system has a capacity of 1162kWp.