Project Description

The rooftop solar power system at this plant was implemented on September 22, 2020, with VAS as the project developer and contractor. This system has a capacity of 1162kWp.

Project Overview

  • System Capacity: 1162kWp
  • Construction Location: Land Lot 1080 and 1081, Map Sheet No. 35; Bo La Hamlet, Phuoc Hoa Commune, Phu Giao District, Binh Duong Province, Vietnam
  • Operation: VAS Energy Technology Co., Ltd
  • Handover: 12/2020
  • Annual Output: Approximately 1518 MWh
  • CO2 Emission Reduction to Date: Approximately 721 tons