Project Description
The rooftop solar power system at this plant was implemented on August 19, 2020, with VAS as the project developer and contractor. This system has a capacity of 1200kWp.
Home page/ Projects / HPS1
The rooftop solar power system at this plant was implemented on August 19, 2020, with VAS as the project developer and contractor. This system has a capacity of 1200kWp.