Project Description
Thien Đuong Sai Gon Memorial Park is the only high-end cemetery park project currently located on the “dragon vein” land of the Mekong Delta. The rooftop solar power system at this plant was implemented on October 6, 2020, with VAS acting as both the developer and contractor. This system has a capacity of 25kWp.