Project Description

Trimco Group is a leading provider of traceability solutions, data management, and RFID for fashion and footwear brands. The solar power system at the factory was initiated on July 30, 2024, with a total installed capacity of 160.545 kWp.

Project Overview

  • Installed capacity: 160.545 kWp
  • Address: No. 18C, Road 24, Vietnam-Singapore II-A Industrial Park, Vinh Tan Ward, Tan Uyen City, Binh Duong Province, Vietnam –
  • Operating unit: VAS Energy Technology Co., Ltd.
  • Handover date: August 30, 2024 (Construction period: July 30, 2024 – August 30, 2024)
  • Annual electricity output: approximately 233 MWh
  • Cumulative CO₂ emissions reduction: approximately 107 tons
TRIMCO-GROUP