Project Description
The rooftop solar power system at this plant was implemented on September 13, 2020, with VAS acting as both the developer and contractor. This system has a capacity of 113kWp.
Home page/ Projects / Truongthuc
The rooftop solar power system at this plant was implemented on September 13, 2020, with VAS acting as both the developer and contractor. This system has a capacity of 113kWp.