Project Description

The rooftop solar power system at this plant was implemented on September 13, 2020, with VAS acting as both the developer and contractor. This system has a capacity of 113kWp.

Project Overview

  • System Capacity: 113kWp
  • Location: No. 43, Nhon Ngai Hamlet, Nhon My Commune, Cho Moi District, An Giang Province, Vietnam
  • Operation: VAS Energy Technology Co., Ltd.
  • Handover: 11/2020
  • Annual Output: Approximately 134 MWh
  • CO2 Emission Reduction to Date: Approximately 63 tons