Project Description
The rooftop solar power system at this plant was implemented on October 25, 2020, with VAS as the project developer and contractor. This system has a capacity of 999kWp.
Home page/ Projects / LK
The rooftop solar power system at this plant was implemented on October 25, 2020, with VAS as the project developer and contractor. This system has a capacity of 999kWp.